July 28, 2016
Hampton Preserve

Driveways and patios are going in

July 28, 2016
Hampton Preserve
driveway poured.jpg
patios poured.jpg

The driveways and back patios are being poured this week. The patios and the Morris driveway are done and the other two driveways will be poured today.

July 28, 2016
Hampton Preserve

Hampton Preserve

Almost Finished....
Lots are graded for driveway installation